R S N
Condensador

Cargo operation, transfer into RSN warehouses in Valencia, and sea shipment, from the Puertollano Thermal Power Plant to Jebel Ali.

RSN, remove the piece from Puertollano’s Thermal Power Plant. The operation required detailed planning and the use of two telescopic cranes in order to manipulate and positioning the 33 tons piece.

The piece, a no longer in use condenser almost 9 meters long, was secured in order to be transferred to the RSN warehouse in Valencia where it was conditioned for its maritime shipping.

RSN transferred the condenser to a 40 FT container, OOH OW OH type, specially selected for this component.

Finally, RSN managed the freight from the port of Valencia to the piece final destination in Jebel Ali, Dubai.

We share the details of the operation and a summary video with more details:

Length8,80 m
Width3,15 m
Height2,50 m
Weight33.000 Kg